Maelor Foods - Poultry Processing Facility

The Challenge

Maelor Foods set out to create one of the most advanced poultry processing facilities in the UK. The chosen site—a former dairy factory—required a complete transformation and significant expansion to meet the demands of modern food production. The goal was to deliver a high-capacity, efficient, and hygienic environment that adhered to strict industry standards.

Our Solution

RCA leveraged its deep expertise in food factory construction to design and build a state-of-the-art facility. The project included:

  • Specialised Zones: Side offloading area, holding area, gas pit, and bird preparation zones, including a dedicated fillet section.

  • Cold Store Infrastructure: Multiple chill rooms and loading docks to maintain product integrity.

  • Logistics Support: A purpose-built lorry park for streamlined transportation.

  • Sustainability Measures: Installation of a water treatment plant to ensure efficient and environmentally responsible operations.

The Result

The completed facility stands as the UK’s second-largest poultry processing plant, combining cutting-edge technology with operational efficiency. Mealor Foods now benefits from a modern, scalable infrastructure that supports high-volume production while meeting stringent quality and safety standards.

  • Maelor Foods

  • Wrexham, North Wales

  • Industrial / Food Production

  • 2016 - 2019

All Projects
Previous
Previous

Vale Royal Fresh Foods

Next
Next

RATP Dev Partnership