Allerton Depot – High-Level and Mid-Level Access Platforms
- Client
- Northern
- Location
- Liverpool, England
- Sector
- Rail
- Our role
- Principal Designer (CDM 2015)
The problem
Northern engaged RCA Construction as Principal Designer under the Construction (Design and Management) Regulations 2015 to deliver the detailed design of two new platforms within the existing Allerton Depot main shed, enabling the depot team to simplify and reduce maintenance of its existing and future fleets. Essential maintenance equipment was spread across adjacent depot buildings, which created stabling and sequencing challenges during daily operations.
The platforms had to provide safe and easy access to all maintenance areas and integrate with the existing interlocking systems, given the 25kV overhead line equipment across the depot. They also had to achieve compliant fire resistance without affecting the existing emergency fire arrangements.
Our approach
RCA Construction engaged the depot team early to arrange a point cloud survey, which was essential given the limited clearances, the network of existing services and coinciding projects, including the Allerton heating project, which directly affected the scope. The design scope included:
- High-level and mid-level access platforms and supporting steelwork, with safe access and emergency exit to both.
- A removable safety handrail to allow essential maintenance.
- A monorail crane and supporting steelwork for HVAC and pantograph maintenance.
- Manual interlocking, anti-climb fencing and high-level anti-fall mesh.
- Fire strategy, safety signage, lighting and electrical bonding.
- A gauging assessment of the proposed works.
- Coordination with coinciding projects, and stakeholder meetings with the depot operations team.
RCA Construction liaised with Network Rail and submitted a combined Form G to secure approval before construction.
The outcome
To limit disruption to the depot, the design reuses the existing steel frame and concrete pit foundations and requires no excavation, and it suits every fleet configuration maintained at the depot. A bespoke removable handrail gives access to the train roof at any point along the platform, and an interlocked swing gate with anti-fall mesh across the high-level platform creates a “boxing ring” that protects staff during HVAC and OLE pantograph maintenance.
The mid-level platform gives step-free access into a carriage while maintaining access to rail level below.